Accessibility Photo Survey

For Hunsti 4077 by DENNIS ROBERTS

  1. Photo by

    1. Photo shows the kissing gate on the far side of the first bridge 2.5 km from start — 13 May 2021

  2. Photo by

    2. Cattle in the field between first bridge and second bridge 2.5 km from start — 13 May 2021

  3. Photo by

    3. Kissing gate to second bridge with several steps 2.5 km from start — 13 May 2021

  4. Photo by

    4. Exit from second bridge with small incline up slope. 2.5 km from start — 13 May 2021

  5. Photo by

    5. Bridge with 10 steps up 6 km from start — 13 May 2021

Back to route