-
1. Norton Radstock Greenway , typical paved surface 0.8 km from start — 09 May 2024
-
2. Pedestrian Controlled lights over A362 1.77 km from start — 09 May 2024
-
3. Footpath runs between structures 1.9 km from start — 09 May 2024
-
4. Typical paved surface after A362 2.1 km from start — 09 May 2024
-
5. Pedestrian Controlled lights in Radstock 3 km from start — 09 May 2024