-
1. Kerb approx 25 mm high next to chip shop in area down to railway station 0.1 km from start — 16 Jun 2021
-
2. Pedestrian controlled lights, just prior to access onto canal towpath 0.6 km from start — 16 Jun 2021
-
3. Pedestrian controlled lights, just prior to access onto canal towpath 0.6 km from start — 16 Jun 2021
-
4. Typical canal towpath finish 2 km from start — 16 Jun 2021
-
5. Ramp up to bridge over water feature 5 km from start — 16 Jun 2021
-
6. Ramp over crossing 6.5 km from start — 16 Jun 2021
-
7. Old A350 route into Melksham 9.6 km from start — 16 Jun 2021