1. For this survey of 'Totsou one' I walked from Southampton to Totton. This sidewalk obstruction is not far from the Southampton Train Station. km from start — 16 May 2024
2. This is the entrance to the bike/ped path. It's uphill and a short distance from the Southampton Train Station. There is ample room to navigate the barriers. km from start — 16 May 2024
3. The second section of the bike/ped path shown in photo 2. While straight, it is an uphill climb. km from start — 16 May 2024
4. The route then enters a quiet residential area (parts of Millbrook Road are one-way for vehicle traffic) with sidewalks. However, vehicles and trash cans can block full sidewalk access. km from start — 16 May 2024
5. The area near the Millbrook Train Station features rentable bikes and scooters. Bikes and pedestrians share the lane. Some sections are ample but others are more narrow. km from start — 16 May 2024
6. Some sections will have dividing lines between cyclists and pedestrians. km from start — 16 May 2024
7. There are sections that have been freshly updated - the quality of the path is very even - but there aren't any lane lines. km from start — 16 May 2024
8. As the route enters 4 Third Ave (near Go Outdoors), the bike lanes are new, but the pedestrian sidewalks are older, rough, and patched in places, and in some intersections, without curb cuts. km from start — 16 May 2024
9. Example of intersection along this stretch of Third Ave without kerb cuts. However, it is possible is access a sloping grade without going too far out of your way. km from start — 16 May 2024
10. All crossing intersections along the path are clearly marked and signaled. km from start — 16 May 2024
11. Traffic circles are clearly marked for cycling paths. km from start — 16 May 2024
12. An example of a section that has bike lanes on one side and a pedestrian sidewalk on the other. There isn't a designated crossing here but visibility is clear on both sides. km from start — 16 May 2024
13. As the route ends and you approach Totton, the sidewalk becomes rough in places and can be blocked by vehicles (as it's a commercial stretch). km from start — 16 May 2024